Native SECS/GEM. No middleware layer.
GEM E30-compliant host communication with direct S6F11 defect event push to your MES. Qualifies in standard ATC test framework in 2–3 days.
S6F11
<L 3
<U4 1> ; DataID
<U4 201> ; CEID: InspectionComplete
<L 1 ; Reports list
<L 2
<U4 301> ; RPTID: DefectReport
<L 3
<A "W-29A-0471"> ; WaferID
<U2 13 8> ; Die X/Y coords
<A "PART-LG"> ; DefectClass
>
>
>
>
What the integration layer handles
Both transport protocols and the full GEM E30 state machine are implemented natively. No external SECS/GEM library licenses required.
HSMS-SS over Ethernet
High-speed SECS message services (SEMI E37) over TCP/IP. Preferred for modern 300mm tools. Configurable port, IP, and timeout. Passive mode (equipment waits for host connect) and active mode supported.
SECS-II RS-232
RS-232 serial transport for legacy equipment stacks still using hardwired SECS-II. Baud rate, parity, and stop bit configurable. Required for older 200mm infrastructure.
GEM E30 State Machine
Full GEM compliance: all required communication states, equipment constants (EC), status variables (SV), alarm management, and remote control. SEMI E30 compliance verification report available on request.
ATC Qualification Support
Pre-configured ATC test sequences for common MES vendors. Typical qualification timeline: 2–3 days with your integration engineer on-site. Remote qualification support available via secure screen-share.
Pre-configured GEM events
Standard event map shipped with the system. Additional events can be configured through the recipe editor without engineering engagement.
| CEID | Event Name | Trigger | Data Payload |
|---|---|---|---|
| 201 | InspectionComplete | Each wafer exit | WaferID, DefectCount, DefectMap |
| 202 | DefectThresholdExceeded | Defect count > recipe limit | WaferID, DefectClass, Count, Threshold |
| 203 | LotComplete | Lot last wafer exit | LotID, WaferCount, LotYieldSummary |
| 204 | RecipeChange | Active recipe switched | RecipeID, ProcessNode, Layer |
| 205 | SystemAlarm | Hardware/software fault | AlarmID, Severity, Description |
Download the SECS/GEM Integration Checklist
Complete ATC qualification procedure with host configuration, event subscription setup, and MES push verification steps.